Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 62 tok/s
Gemini 2.5 Pro 48 tok/s Pro
GPT-5 Medium 14 tok/s Pro
GPT-5 High 13 tok/s Pro
GPT-4o 93 tok/s Pro
Kimi K2 213 tok/s Pro
GPT OSS 120B 458 tok/s Pro
Claude Sonnet 4 38 tok/s Pro
2000 character limit reached

Towards Measuring the Impact of Technical Debt on Lead Time: An Industrial Case Study (2406.01578v1)

Published 3 Jun 2024 in cs.SE

Abstract: Background: Software companies must balance fast value delivery with quality, a trade-off that can introduce technical debt and potentially waste developers' time. As software systems evolve, technical debt tends to increase. However, estimating its impact on lead time still requires more empirical and experimental evidence. Objective: We conduct an empirical study investigating whether technical debt impacts lead time in resolving Jira issues. Furthermore, our aim is to measure the extent to which variance in lead time is explainable by the technical debt. Method: We conducted an industrial case study to examine the relationship in six components, each of which was analyzed individually. Technical debt was measured using SonarQube and normalized with the component's size, while lead time to resolve Jira issues was collected directly from Jira. Results: We found a set of mixed results. Technical debt had a moderate positive impact on lead time in two components, while we did not see a meaningful impact on two others. A moderate negative impact was found in the remaining two components. Conclusion: The findings show that technical debt alone can not explain all the variance in lead time, which ranges from 5% up to 41% across components. So, there should be some other variables (e.g., size of the changes made, complexity, number of teams involved, component ownership) impacting lead time, or it might have a residual effect that might manifest later on. Further investigation into those confounding variables is essential.

Citations (1)

Summary

We haven't generated a summary for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Lightbulb On Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

Don't miss out on important new AI/ML research

See which papers are being discussed right now on X, Reddit, and more:

“Emergent Mind helps me see which AI papers have caught fire online.”

Philip

Philip

Creator, AI Explained on YouTube