Papers
Topics
Authors
Recent
Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 168 tok/s
Gemini 2.5 Pro 47 tok/s Pro
GPT-5 Medium 35 tok/s Pro
GPT-5 High 34 tok/s Pro
GPT-4o 130 tok/s Pro
Kimi K2 170 tok/s Pro
GPT OSS 120B 437 tok/s Pro
Claude Sonnet 4.5 37 tok/s Pro
2000 character limit reached

Efficient and Robust Time-Optimal Trajectory Planning and Control for Agile Quadrotor Flight (2305.02772v1)

Published 4 May 2023 in cs.RO, cs.SY, and eess.SY

Abstract: Agile quadrotor flight relies on rapidly planning and accurately tracking time-optimal trajectories, a technology critical to their application in the wild. However, the computational burden of computing time-optimal trajectories based on the full quadrotor dynamics (typically on the order of minutes or even hours) can hinder its ability to respond quickly to changing scenarios. Additionally, modeling errors and external disturbances can lead to deviations from the desired trajectory during tracking in real time. This letter proposes a novel approach to computing time-optimal trajectories, by fixing the nodes with waypoint constraints and adopting separate sampling intervals for trajectories between waypoints, which significantly accelerates trajectory planning. Furthermore, the planned paths are tracked via a time-adaptive model predictive control scheme whose allocated tracking time can be adaptively adjusted on-the-fly, therefore enhancing the tracking accuracy and robustness. We evaluate our approach through simulations and experimentally validate its performance in dynamic waypoint scenarios for time-optimal trajectory replanning and trajectory tracking.

Citations (8)

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.