Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 60 tok/s
Gemini 2.5 Pro 51 tok/s Pro
GPT-5 Medium 18 tok/s Pro
GPT-5 High 14 tok/s Pro
GPT-4o 77 tok/s Pro
Kimi K2 159 tok/s Pro
GPT OSS 120B 456 tok/s Pro
Claude Sonnet 4 38 tok/s Pro
2000 character limit reached

On Minimizing Tardy Processing Time, Max-Min Skewed Convolution, and Triangular Structured ILPs (2211.05053v2)

Published 9 Nov 2022 in cs.DS

Abstract: The starting point of this paper is the problem of scheduling $n$ jobs with processing times and due dates on a single machine so as to minimize the total processing time of tardy jobs, i.e., $1||\sum p_j U_j$. This problem was identified by Bringmann et al. (Algorithmica 2022) as a natural subquadratic-time special case of the classic $1||\sum w_j U_j$ problem, which likely requires time quadratic in the total processing time $P$, because of a fine-grained lower bound. Bringmann et al.~obtain their $\tilde{O}(P{7/4})$ time scheduling algorithm through a new variant of convolution, dubbed Max-Min Skewed Convolution, which they solve in $\tilde{O}(n{7/4})$ time. Our main technical contribution is a faster and simpler convolution algorithm running in $\tilde{O}(n{5/3})$ time. It implies an $\tilde{O}(P{5/3})$ time algorithm for $1||\sum p_j U_j$, but may also be of independent interest. Inspired by recent developments for the Subset Sum and Knapsack problems, we study $1||\sum p_j U_j$ parameterized by the maximum job processing time $p_{\max}$. With proximity techniques borrowed from integer linear programming (ILP), we show structural properties of the problem that, coupled with a new dynamic programming formulation, lead to an $\tilde{O}(n+p_{\max}3)$ time algorithm. Moreover, in the setting with multiple machines, we use similar techniques to get an $n \cdot p_{\max}{O(m)}$ time algorithm for $Pm||\sum p_j U_j$. Finally, we point out that the considered problems exhibit a particular triangular block structure in the constraint matrices of their ILP formulations. In light of recent ILP research, a question that arises is whether one can devise a generic algorithm for such a class of ILPs. We give a negative answer to this question: we show that already a slight generalization of the structure of the scheduling ILP leads to a strongly NP-hard problem.

Citations (8)

Summary

We haven't generated a summary for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Lightbulb On Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.