Papers
Topics
Authors
Recent
Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 148 tok/s
Gemini 2.5 Pro 44 tok/s Pro
GPT-5 Medium 23 tok/s Pro
GPT-5 High 30 tok/s Pro
GPT-4o 86 tok/s Pro
Kimi K2 197 tok/s Pro
GPT OSS 120B 458 tok/s Pro
Claude Sonnet 4.5 38 tok/s Pro
2000 character limit reached

On Preemptive Scheduling of Unrelated Machines Using Linear Programming (2205.02351v1)

Published 4 May 2022 in cs.DS

Abstract: We consider a basic problem of preemptive scheduling of $n$ non-simultaneously released jobs on a group of $m$ unrelated parallel machines so as to minimize maximum job completion time, the makespan. In the scheduling literature, the problem is commonly considered to be solvable in polynomial time by linear programming (LP) techniques proposed in Lawler and Labetoulle \cite{ll78}. The authors in \cite{ll78} give a LP formulation of the version with simultaneously released jobs and show how an optimal solution to this LP can be used to construct an optimal schedule to the latter problem. As the current study shows, for non-simultaneously released jobs, unlikely, there exist a linear program such that a schedule with the minimum makespan can be constructed based on an optimal LP solution. We also prove that, in case no splitting of the same job on a machine is allowed (i.e., job part assigned to a machine is to be processed without an interruption on that machine), the problem is NP-hard. As a side result, we obtain that, whenever job splitting is not allowed, given an optimal LP solution, it is NP-hard to find an optimal schedule with the minimum makespan that agrees with that LP solution. We also extend the schedule construction procedure based on an optimal LP solution from Lawler and Labetoulle \cite{ll78} for non-simultaneously released jobs. The extended procedure, among all feasible schedules that agree with any feasible (not necessarily optimal) LP solution, generates one with the minimum makespan. Such procedure is helpful, in particular, because, as we show, there may exist no optimal schedule that agrees with an optimal LP solution if jobs are non-simultaneously released.

Citations (3)

Summary

We haven't generated a summary for this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

Authors (1)

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.