Emergent Mind

Abstract

One of the critical challenges in infrastructural constructions is designing and planning operations and their related resources. The complex interlinked composition of different factors and variables affecting resource productivity has made simulation a powerful approach for operational planning. The construction sector has recently seen a notable surge in applying various simulation tools to enhance further the quality of projects planning, particularly in large-scale infrastructure developments (e.g., highway construction). Due to possible cost overruns in improper resource allocation, optimizing the design and construction planning stages of megaprojects such as massive pavement projects is essential. Recent studies aimed to build a simulation-based strategy in construction designing and planning by combining various simulation approaches (e.g., discrete-event simulation, system dynamics, agent-based simulation, and hybrid simulation) to enhance the planning phase. This paper introduces an evolving real-time hybrid simulation technique regarding the projects intrinsic time-varying inputs and factors to optimize the planning of Roller Compacted Concrete (RCC) pavement projects. Several scenarios are investigated using various resource combinations to achieve the best execution method for delivering concrete to the project. An actual highway project case study validates the proposed model and its application for future projects. This studys findings exhibit the proficiencies of the simulation-based approach in resource planning of RCC pavement projects within the time and cost constraints and their related regulations.

We're not able to analyze this paper right now due to high demand.

Please check back later (sorry!).

Generate a summary of this paper on our Pro plan:

We ran into a problem analyzing this paper.

Newsletter

Get summaries of trending comp sci papers delivered straight to your inbox:

Unsubscribe anytime.