Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 89 tok/s
Gemini 2.5 Pro 48 tok/s Pro
GPT-5 Medium 15 tok/s Pro
GPT-5 High 19 tok/s Pro
GPT-4o 90 tok/s Pro
Kimi K2 211 tok/s Pro
GPT OSS 120B 459 tok/s Pro
Claude Sonnet 4 37 tok/s Pro
2000 character limit reached

Necessary and Sufficient Girth Conditions for Tanner Graphs of Quasi-Cyclic LDPC Codes (2105.03462v1)

Published 7 May 2021 in cs.IT and math.IT

Abstract: This paper revisits the connection between the girth of a protograph-based LDPC code given by a parity-check matrix and the properties of powers of the product between the matrix and its transpose in order to obtain the necessary and sufficient conditions for a code to have given girth between 6 and 12, and to show how these conditions can be incorporated into simple algorithms to construct codes of that girth. To this end, we highlight the role that certain submatrices that appear in these products have in the construction of codes of desired girth. In particular, we show that imposing girth conditions on a parity-check matrix is equivalent to imposing conditions on a square submatrix obtained from it and we show how this equivalence is particularly strong for a protograph based parity-check matrix of variable node degree 2, where the cycles in its Tanner graph correspond one-to-one to the cycles in the Tanner graph of a square submatrix obtained by adding the permutation matrices (or products of these) in the composition of the parity-check matrix. We end the paper with exemplary constructions of codes with various girths and computer simulations. Although, we mostly assume the case of fully connected protographs of variable node degree 2 and 3, the results can be used for any parity-check matrix/protograph-based Tanner graph.

Citations (4)
List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-Up Questions

We haven't generated follow-up questions for this paper yet.