Papers
Topics
Authors
Recent
Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 145 tok/s
Gemini 2.5 Pro 40 tok/s Pro
GPT-5 Medium 22 tok/s Pro
GPT-5 High 23 tok/s Pro
GPT-4o 107 tok/s Pro
Kimi K2 195 tok/s Pro
GPT OSS 120B 446 tok/s Pro
Claude Sonnet 4.5 36 tok/s Pro
2000 character limit reached

Optimal Phasor Measurement Unit Placement Using a Honey Bee Mating Optimization (HBMO) Technique Considering Measurement Loss and Line Outages (2105.02102v1)

Published 5 May 2021 in eess.SY and cs.SY

Abstract: Phasor measurement units (PMUs) are important devices for protection, monitoring, and control of modern power systems. Unlike the supervisory control and data acquisition (SCADA) system which only measure the magnitude, PMUs can provide a set of synchronized phasor measurements with high sampling rate with the accuracy of less than one second, for better system monitoring especially during the outages. Since the PMUs are costly devices, system operator is not able to install a PMU at each bus to maximize the observability of system. To this end, determination of the number of PMUs in the system for having a 100% observability is pivotal. In this paper, honey bee mating optimization (HBMO) approach is utilized to allocate PMUs in modern power systems. Moreover, the impact of line outages, as well as measurement loses, are considered. The simulation results show the effectiveness of the proposed method on solving the PMU placement problem.

Citations (1)

Summary

We haven't generated a summary for this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.