Papers
Topics
Authors
Recent
Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 165 tok/s
Gemini 2.5 Pro 46 tok/s Pro
GPT-5 Medium 27 tok/s Pro
GPT-5 High 27 tok/s Pro
GPT-4o 64 tok/s Pro
Kimi K2 183 tok/s Pro
GPT OSS 120B 432 tok/s Pro
Claude Sonnet 4.5 36 tok/s Pro
2000 character limit reached

Managing Requirements Change the Informal Way: When Saying 'No' is Not an Option (2104.00843v1)

Published 2 Apr 2021 in cs.SE

Abstract: Software has always been considered as malleable. Changes to software requirements are inevitable during the development process. Despite many software engineering advances over several decades, requirements changes are a source of project risk, particularly when businesses and technologies are evolving rapidly. Although effectively managing requirements changes is a critical aspect of software engineering, conceptions of requirements change in the literature and approaches to their management in practice still seem rudimentary. The overall goal of this study is to better understand the process of requirements change management. We present findings from an exploratory case study of requirements change management in a globally distributed setting. In this context we noted a contrast with the traditional models of requirements change. In theory, change control policies and formal processes are considered as a natural strategy to deal with requirements changes. Yet we observed that "informal requirements changes" (InfRc) were pervasive and unavoidable. Our results reveal an equally 'natural' informal change management process that is required to handle InfRc in parallel. We present a novel model of requirements change which, we argue, better represents the phenomenon and more realistically incorporates both the informal and formal types of change.

Citations (16)

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.