Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 71 tok/s
Gemini 2.5 Pro 52 tok/s Pro
GPT-5 Medium 18 tok/s Pro
GPT-5 High 15 tok/s Pro
GPT-4o 101 tok/s Pro
Kimi K2 196 tok/s Pro
GPT OSS 120B 467 tok/s Pro
Claude Sonnet 4 37 tok/s Pro
2000 character limit reached

Seizing Opportunity: Maintenance Optimization in Offshore Wind Farms Considering Accessibility, Production, and Crew Dispatch (2012.00213v3)

Published 1 Dec 2020 in eess.SY, cs.SY, and math.OC

Abstract: Operations and Maintenance (O&M) constitute a major contributor to offshore wind's cost of energy. Due to the harsh and remote environment in which offshore turbines operate, there has been a growing interest in opportunistic maintenance scheduling for offshore wind farms, wherein grouping maintenance tasks is incentivized at times of opportunity. Our survey of the literature, however, reveals that there is no unified consensus on what constitutes an "opportunity" for offshore maintenance. We therefore propose an opportunistic maintenance scheduling approach which defines an opportunity as either crew-dispatch-based (initiated by a maintenance crew already dispatched to a neighboring turbine), production-based (initiated by projected low production levels), or access-based (initiated by a provisionally open window of turbine access). We formulate the problem as a multi-staged rolling-horizon mixed integer linear program, and propose an iterative solution algorithm to identify the optimal hourly maintenance schedule, which is found to be drastically different, yet substantially better, than those obtained using offshore-agnostic strategies. Extensive numerical experiments on actual wind, wave, and power data demonstrate substantial margins of improvement achieved by our proposed approach, across a wide variety of key O&M metrics.

Citations (46)
List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-Up Questions

We haven't generated follow-up questions for this paper yet.