Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 72 tok/s
Gemini 2.5 Pro 57 tok/s Pro
GPT-5 Medium 43 tok/s Pro
GPT-5 High 23 tok/s Pro
GPT-4o 107 tok/s Pro
Kimi K2 219 tok/s Pro
GPT OSS 120B 465 tok/s Pro
Claude Sonnet 4 39 tok/s Pro
2000 character limit reached

Scheduling with Complete Multipartite Incompatibility Graph on Parallel Machines (2010.13207v2)

Published 25 Oct 2020 in cs.DS

Abstract: In this paper we consider the problem of scheduling on parallel machines with a presence of incompatibilities between jobs. The incompatibility relation can be modeled as a complete multipartite graph in which each edge denotes a pair of jobs that cannot be scheduled on the same machine. Our research stems from the work of Bodlaender et al.~[1992, 1993]. In particular, we pursue the line investigated partially by Mallek et al.~[2019], where the graph is complete multipartite so each machine can do jobs only from one partition. We also tie our results to the recent approach for so-called identical machines with class constraints by Jansen et al.~[2019], providing a link between our case and their generalization. In the paper we provide several algorithms constructing schedules, optimal or approximate with respect to the two most popular criteria of optimality: Cmax (the makespan) and {\Sigma}Cj(the total completion time). We consider a variety of machine types in our paper: identical, uniform, unrelated, and a natural subcase of unrelated machines. Our results consist of delimitation of the easy (polynomial) and NP-hard problems within these constraints. In the case when the problem is hard, we also provide algorithm, either with a guaranteed constant worst-case approximation ratio or even in some cases a PTAS. In particular, we fill the gap on research for the problem of finding a schedule with smallest total completion time on uniform machines. We address this problem by developing a linear programming relaxation technique with an appropriate rounding, which to our knowledge is a novelty for this criterion in the considered setting.

Citations (3)
List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-Up Questions

We haven't generated follow-up questions for this paper yet.