Papers
Topics
Authors
Recent
Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 173 tok/s
Gemini 2.5 Pro 48 tok/s Pro
GPT-5 Medium 33 tok/s Pro
GPT-5 High 28 tok/s Pro
GPT-4o 94 tok/s Pro
Kimi K2 177 tok/s Pro
GPT OSS 120B 450 tok/s Pro
Claude Sonnet 4.5 36 tok/s Pro
2000 character limit reached

Dynamic Budget Management with Service Guarantees for Mixed-Criticality Systems (2003.08364v1)

Published 11 Mar 2020 in cs.DC and cs.OS

Abstract: Many existing studies on mixed-criticality (MC) scheduling assume that low-criticality budgets for high-criticality applications are known apriori. These budgets are primarily used as guidance to determine when the scheduler should switch the system mode from low to high. Based on this key observation, in this paper we propose a dynamic MC scheduling model under which low-criticality budgets for individual high-criticality applications are determined at runtime as opposed to being fixed offline. To ensure sufficient budget for high-criticality applications at all times, we use offline schedulability analysis to determine a system-wide total low-criticality budget allocation for all the high-criticality applications combined. This total budget is used as guidance in our model to determine the need for a mode-switch. The runtime strategy then distributes this total budget among the various applications depending on their execution requirement and with the objective of postponing mode-switch as much as possible. We show that this runtime strategy is able to postpone mode-switches for a longer time than any strategy that uses a fixed low-criticality budget allocation for each application. Finally, since we are able to control the total budget allocation for high-criticality applications before mode-switch, we also propose techniques to determine these budgets considering system-wide objectives such as schedulability and service guarantee for low-criticality applications.

Citations (51)

Summary

We haven't generated a summary for this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.