Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 45 tok/s
Gemini 2.5 Pro 49 tok/s Pro
GPT-5 Medium 11 tok/s Pro
GPT-5 High 19 tok/s Pro
GPT-4o 88 tok/s Pro
Kimi K2 214 tok/s Pro
GPT OSS 120B 460 tok/s Pro
Claude Sonnet 4 36 tok/s Pro
2000 character limit reached

Gaussian Process Regression for Probabilistic Short-term Solar Output Forecast (2002.10878v1)

Published 23 Feb 2020 in stat.AP, cs.LG, and eess.SP

Abstract: With increasing concerns of climate change, renewable resources such as photovoltaic (PV) have gained popularity as a means of energy generation. The smooth integration of such resources in power system operations is enabled by accurate forecasting mechanisms that address their inherent intermittency and variability. This paper proposes a probabilistic framework to predict short-term PV output taking into account the uncertainty of weather. To this end, we make use of datasets that comprise of power output and meteorological data such as irradiance, temperature, zenith, and azimuth. First, we categorise the data into four groups based on solar output and time by using k-means clustering. Next, a correlation study is performed to choose the weather features which affect solar output to a greater extent. Finally, we determine a function that relates the aforementioned selected features with solar output by using Gaussian Process Regression and Matern 5/2 as a kernel function. We validate our method with five solar generation plants in different locations and compare the results with existing methodologies. More specifically, in order to test the proposed model, two different methods are used: (i) 5-fold cross-validation; and (ii) holding out 30 random days as test data. To confirm the model accuracy, we apply our framework 30 independent times on each of the four clusters. The average error follows a normal distribution, and with 95% confidence level, it takes values between -1.6% to 1.4%.

Citations (40)
List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-Up Questions

We haven't generated follow-up questions for this paper yet.