Emergent Mind

Optimized energy utilization in small and large commercial loads and residential areas

(1906.10786)
Published Jun 25, 2019 in eess.SY , cs.SY , and math.OC

Abstract

In smart grid, the demand side management (DSM) techniques need to be designed to process a large number of controllable loads of several types. In this paper, we proposed a framework to study the demand side management in smart grid which contains a variety of loads in two service areas, one with multiple residential households, and one bus with commercial customers. Specifically, each household may have renewable generation as well as interruptible and uninterruptible appliances to make individual scheduling to optimize the electric energy cost by making the best time of the electricity usage according to the day ahead forecast of electricity prices. A high load bus represents a commercial area employed to demonstrate the impact of high load at any bus on voltage profile, power loss, and load flow condition, and to show the performance of the proposed DSM for large number of appliance. Using the developed simulation model, we examine the performance of the proposed DSM and study their impact on the distribution network operation and renewable generation, overall voltage deviation, real power loss, and possible problems such as reverse power flows, voltage rise have examined and compared, these problems can easily be seen at the commercial load bus.

We're not able to analyze this paper right now due to high demand.

Please check back later (sorry!).

Generate a summary of this paper on our Pro plan:

We ran into a problem analyzing this paper.

Newsletter

Get summaries of trending comp sci papers delivered straight to your inbox:

Unsubscribe anytime.