Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 45 tok/s
Gemini 2.5 Pro 52 tok/s Pro
GPT-5 Medium 30 tok/s Pro
GPT-5 High 24 tok/s Pro
GPT-4o 96 tok/s Pro
Kimi K2 206 tok/s Pro
GPT OSS 120B 457 tok/s Pro
Claude Sonnet 4 39 tok/s Pro
2000 character limit reached

A Global Solution Method for Decentralized Multi-Area SCUC and Savings Allocation Based on MILP Value Functions (1906.07126v1)

Published 17 Jun 2019 in eess.SY and cs.SY

Abstract: To address the issue that Lagrangian dual function based algorithms cannot guarantee convergence and global optimality for decentralized multi-area security constrained unit commitment (M-SCUC) problems, a novel decomposition and coordination method using MILP (mixed integer linear programming) value functions is proposed in this paper. Each regional system operator sets the tie-line power injections as variational parameters in its regional SCUC model, and utilizes a finite algorithm to generate a MILP value function, which returns the optimal generation cost for any given interchange scheduling. With the value functions available from all system operators, theoretically, a coordinator is able to derive a globally optimal interchange scheduling. Since power exchanges may alter the financial position of each area considerably from what it would have been via scheduling independently, we then propose a fair savings allocation method using the values functions derived above and the Shapley value in cooperative game theory. Numerical experiments on a two-area 12-bus system and a three-area 457-bus system are carried out. The validness of the value functions based method is verified for the decentralized M-SCUC problems. The outcome of savings allocation is compared with that of the locational marginal cost based method.

Citations (3)
List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-Up Questions

We haven't generated follow-up questions for this paper yet.