Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 48 tok/s
Gemini 2.5 Pro 48 tok/s Pro
GPT-5 Medium 26 tok/s Pro
GPT-5 High 19 tok/s Pro
GPT-4o 107 tok/s Pro
Kimi K2 205 tok/s Pro
GPT OSS 120B 473 tok/s Pro
Claude Sonnet 4 38 tok/s Pro
2000 character limit reached

Stochastic Load Balancing on Unrelated Machines (1904.07271v1)

Published 15 Apr 2019 in cs.DS

Abstract: We consider the problem of makespan minimization on unrelated machines when job sizes are stochastic. The goal is to find a fixed assignment of jobs to machines, to minimize the expected value of the maximum load over all the machines. For the identical machines special case when the size of a job is the same across all machines, a constant-factor approximation algorithm has long been known. Our main result is the first constant-factor approximation algorithm for the general case of unrelated machines. This is achieved by (i) formulating a lower bound using an exponential-size linear program that is efficiently computable, and (ii) rounding this linear program while satisfying only a specific subset of the constraints that still suffice to bound the expected makespan. We also consider two generalizations. The first is the budgeted makespan minimization problem, where the goal is to minimize the expected makespan subject to scheduling a target number (or reward) of jobs. We extend our main result to obtain a constant-factor approximation algorithm for this problem. The second problem involves $q$-norm objectives, where we want to minimize the expected q-norm of the machine loads. Here we give an $O(q/\log q)$-approximation algorithm, which is a constant-factor approximation for any fixed $q$.

Citations (20)

Summary

We haven't generated a summary for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Lightbulb On Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.