2000 character limit reached
Robust scheduling to minimize the weighted number of late jobs with interval due-date uncertainty (1708.03252v1)
Published 8 Aug 2017 in cs.DS
Abstract: We consider the class of single machine scheduling problems with the objective to minimize the weighted number of late jobs, under the assumption that completion due-dates are not known precisely at the time when decision-maker must provide a schedule. It is assumed that only the intervals to which the due-dates belong are known. The concept of maximum regret is used to define robust solution. A polynomial time algorithm is given for the case when weights of jobs are all equal. A mixed-integer linear programming formulation is provided for the general case, and computational experiments are reported.
Collections
Sign up for free to add this paper to one or more collections.
Paper Prompts
Sign up for free to create and run prompts on this paper using GPT-5.