Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 77 tok/s
Gemini 2.5 Pro 33 tok/s Pro
GPT-5 Medium 25 tok/s Pro
GPT-5 High 27 tok/s Pro
GPT-4o 75 tok/s Pro
Kimi K2 220 tok/s Pro
GPT OSS 120B 465 tok/s Pro
Claude Sonnet 4 36 tok/s Pro
2000 character limit reached

Comparison of Flow Scheduling Policies for Mix of Regular and Deadline Traffic in Datacenter Environments (1707.02024v1)

Published 7 Jul 2017 in cs.NI

Abstract: Datacenters are the main infrastructure on top of which cloud computing services are offered. Such infrastructure may be shared by a large number of tenants and applications generating a spectrum of datacenter traffic. Delay sensitive applications and applications with specific Service Level Agreements (SLAs), generate deadline constrained flows, while other applications initiate flows that are desired to be delivered as early as possible. As a result, datacenter traffic is a mix of two types of flows: deadline and regular. There are several scheduling policies for either traffic type with focus on minimizing completion times or deadline miss rate. In this report, we apply several scheduling policies to mix traffic scenario while varying the ratio of regular to deadline traffic. We consider FCFS (First Come First Serve), SRPT (Shortest Remaining Processing Time) and Fair Sharing as deadline agnostic approaches and a combination of Earliest Deadline First (EDF) with either FCFS or SRPT as deadline-aware schemes. In addition, for the latter, we consider both cases of prioritizing deadline traffic (Deadline First) and prioritizing regular traffic (Deadline Last). We study both light-tailed and heavy-tailed flow size distributions and measure mean, median and tail flow completion times (FCT) for regular flows along with Deadline Miss Rate (DMR) and average lateness for deadline flows. We also consider two operation regimes of lightly-loaded (low utilization) and heavily-loaded (high utilization). We find that performance of deadline-aware schemes is highly dependent on fraction of deadline traffic. With light-tailed flow sizes, we find that FCFS performs better in terms of tail times and average lateness while SRPT performs better in average times and deadline miss rate. For heavy-tailed flow sizes, except for tail times, SRPT performs better in all other metrics.

Citations (5)
List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-Up Questions

We haven't generated follow-up questions for this paper yet.