Papers
Topics
Authors
Recent
2000 character limit reached

A Dynamic Multi Agent based scheduling for flexible flow line manufacturing system accompanied by dynamic customer demand (1611.00518v1)

Published 2 Nov 2016 in cs.MA

Abstract: Dynamic rescheduling decision-making problem is an important issue in modern manufacturing system with the feature of combinational computation complexity. This paper introduces a multi-agent based approach using the detailed process, provided by Prometheus methodology, which used for the design of a simultaneous dynamic rescheduling decision making for flexible flow line manufacturing system that working under dynamic customer demand. The application has been completely modeled with the Prometheus Design Tool (PDT), which offers full support to Prometheus Methodology. The proposed dynamic scheduling decision making system is developed for Automated UPVC door and Windows Company and can be support both static and dynamic scheduling.

Summary

We haven't generated a summary for this paper yet.

Whiteboard

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.