Emergent Mind

Shared multi-processor scheduling

(1607.06021)
Published Jul 20, 2016 in cs.DM

Abstract

We study shared multi-processor scheduling problem where each job can be executed on its private processor and simultaneously on one of many processors shared by all jobs in order to reduce the job's completion time due to processing time overlap. The total weighted overlap of all jobs is to be maximized. The problem models subcontracting scheduling in supply chains and divisible load scheduling in computing. We show that synchronized schedules that complete each job at the same time on its private processor and shared processors, if any is actually used by the job, include optimal schedules. We prove that the problem is NP-hard in the strong sense for jobs with arbitrary weights, and we give an efficient, polynomial-time algorithm for the problem with equal weights.

We're not able to analyze this paper right now due to high demand.

Please check back later (sorry!).

Generate a summary of this paper on our Pro plan:

We ran into a problem analyzing this paper.

Newsletter

Get summaries of trending comp sci papers delivered straight to your inbox:

Unsubscribe anytime.