Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 47 tok/s
Gemini 2.5 Pro 37 tok/s Pro
GPT-5 Medium 15 tok/s Pro
GPT-5 High 11 tok/s Pro
GPT-4o 101 tok/s Pro
Kimi K2 195 tok/s Pro
GPT OSS 120B 465 tok/s Pro
Claude Sonnet 4 30 tok/s Pro
2000 character limit reached

Optimization and Reoptimization in Scheduling Problems (1509.01630v1)

Published 4 Sep 2015 in cs.DS

Abstract: Parallel machine scheduling has been extensively studied in the past decades, with applications ranging from production planning to job processing in large computing clusters. In this work we study some of these fundamental optimization problems, as well as their parameterized and reoptimization variants. We first present improved bounds for job scheduling on unrelated parallel machines, with the objective of minimizing the latest completion time (makespan) of the schedule. We consider the subclass of fully-feasible instances, in which the processing time of each job, on any machine, does not exceed the minimum makespan. The problem is known to be hard to approximate within factor 4/3 already in this subclass. Although fully-feasible instances are hard to identify, we give a polynomial time algorithm that yields for such instances a schedule whose makespan is better than twice the optimal, the best known ratio for general instances. Moreover, we show that our result is robust under small violations of feasibility constraints. We further study the power of parameterization. We show that makespan minimization on unrelated machines admits a parameterized approximation scheme, where the parameter used is the number of processing times that are large relative to the latest completion time of the schedule. We also present an FPT algorithm for the graph-balancing problem, which corresponds to the instances of the restricted assignment problem where each job can be processed on at most 2 machines. Finally, motivated by practical scenarios, we initiate the study of reoptimization in job scheduling on identical and uniform machines, with the objective of minimizing the makespan. We develop reapproximation algorithms that yield in both models the best possible approximation ratio of $(1+\epsilon)$, for any $\epsilon >0$, with respect to the minimum makespan.

Citations (1)
List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-Up Questions

We haven't generated follow-up questions for this paper yet.

Authors (1)