Papers
Topics
Authors
Recent
Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 163 tok/s
Gemini 2.5 Pro 46 tok/s Pro
GPT-5 Medium 42 tok/s Pro
GPT-5 High 41 tok/s Pro
GPT-4o 94 tok/s Pro
Kimi K2 184 tok/s Pro
GPT OSS 120B 433 tok/s Pro
Claude Sonnet 4.5 37 tok/s Pro
2000 character limit reached

The Energy Navigator - A Web-Platform for Performance Design and Management (1409.0416v1)

Published 1 Sep 2014 in cs.SE

Abstract: Over the last three decades comprehensive research has been carried out trying to improve commissioning processes with powerful modeling tools and methodologies for data analysis and visualization. Typically addressed application scenarios are facilities management, contracting, special consulting services and measurement & verification as part of a certification process. The results are all but convincing: Monitoring of building operation has so far not become a regular service for buildings. We have identified a lack of process integration as a significant barrier for market success. Most methodologies have so far caused additional initial invest and transaction cost: they added new services instead of improving existing ones. The Energy Navigator, developed by synavision GmbH in cooperation with leading research institutes of the Technical University Braunschweig and the RWTH Aachen University, presents a new methodology with several new approaches. Its software platform uses state graphs and a domain specific language to describe building functions offering an alternative to the software that is so far most widely used for this task: Microsoft Word. The Energy Navigators so called Active Functional Specification (AFS) is used for the technical specification of building services in the design phase. After construction it is completed by the supplier of the BMS (Building Management System) with the relevant sensors data as documentation of his service. Operation data can then automatically be checked for initial and continuous commissioning on whether it meets the criteria of the specification.

Citations (19)

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.