Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 58 tok/s
Gemini 2.5 Pro 52 tok/s Pro
GPT-5 Medium 12 tok/s Pro
GPT-5 High 17 tok/s Pro
GPT-4o 95 tok/s Pro
Kimi K2 179 tok/s Pro
GPT OSS 120B 463 tok/s Pro
Claude Sonnet 4 38 tok/s Pro
2000 character limit reached

Total stretch minimization on single and identical parallel machines (1404.6502v2)

Published 25 Apr 2014 in cs.DS

Abstract: We consider the classical problem of scheduling $n$ jobs with release dates on both single and identical parallel machines. We measure the quality of service provided to each job by its stretch, which is defined as the ratio of its response time to processing time. Our objective is to schedule these jobs non-preemptively so as to minimize sum stretch. So far, there have been very few results for sum stretch minimization especially for the non-preemptive case. For the preemptive version, the Shortest remaining processing time (SRPT) algorithm is known to give $2$-competitive for sum stretch on single machine while its is $13$-competitive on identical parallel machines. Leonardi and Kellerer provided the strong lower bound for the more general problem of \textit{sum (weighted) flow time} in single machine and identical parallel machines, respectively . Therefore, we study this problem with some additional assumptions and present two new competitive ratio for existing algorithms. We show that the Shortest processing time (SPT) algorithm is $\Delta - \frac{1}{\Delta}+1$-competitive for non-preemptive sum stretch minimization on single machine and it is $\Delta - \frac{1}{\Delta}+ \frac{3}{2} -\frac{1}{2m}$ on $m$ identical parallel machines, where $\Delta$ is the upper bound on the ratio between the maximum and the minimum processing time of the jobs.

Summary

We haven't generated a summary for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Lightbulb On Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.