Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 42 tok/s
Gemini 2.5 Pro 53 tok/s Pro
GPT-5 Medium 17 tok/s Pro
GPT-5 High 13 tok/s Pro
GPT-4o 101 tok/s Pro
Kimi K2 217 tok/s Pro
GPT OSS 120B 474 tok/s Pro
Claude Sonnet 4 36 tok/s Pro
2000 character limit reached

Resource Availability-Aware Advance Reservation for Parallel Jobs with Deadlines (1203.0740v1)

Published 4 Mar 2012 in cs.DC

Abstract: Advance reservation is important to guarantee the quality of services of jobs by allowing exclusive access to resources over a defined time interval on resources. It is a challenge for the scheduler to organize available resources efficiently and to allocate them for parallel AR jobs with deadline constraint appropriately. This paper provides a slot-based data structure to organize available resources of multiprocessor systems in a way that enables efficient search and update operations, and formulates a suite of scheduling policies to allocate resources for dynamically arriving AR requests. The performance of the scheduling algorithms were investigated by simulations with different job sizes and durations, system loads and scheduling flexibilities. Simulation results show that job sizes and durations, system load and the flexibility of scheduling will impact the performance metrics of all the scheduling algorithms, and the PE-Worst-Fit algorithm becomes the best algorithm for the scheduler with the highest acceptance rate of AR requests, and the jobs with the First-Fit algorithm experience the lowest average slowdown. The data structure and scheduling policies can be used to organize and allocate resources for parallel AR jobs with deadline constraint in large-scale computing systems.

Citations (7)

Summary

We haven't generated a summary for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Lightbulb On Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.